loader image
Helping You Save
Energy and Money

Commercial Incentives

Commercial Conduit

EARN A $1,000 INCENTIVE

for new commercial construction conduit for a future public charging station

100% reimbursement (maximum of $1,000) for new commercial construction for the installation of conduit to be used for the future installation of an electric vehicle public charging station.

Guidelines
  • Available to commercial customers of Nebraska Public Power District and its wholesale utility partners.
  • Commercial conduit installation must take place at a new construction or commercial/workplace site.
  • To obtain the incentive, all steps on the application must be completed and submitted to utility along with cost details and verification of installation.
  • This incentive is for the installation of conduit for use with conductor for minimum ampacity of the following charger loads per the National Electrical Code (NEC) and/or the running of appropriately sized conduit per NEC from the load center to a future EV public charging station. Load Requirements (exact requirements may vary):
    — Level 2: Single phase, 240 volts, 32 amps per port.
    — Level 3 (DCFC): 480V AC, 3-phase, 80A, 60 Hz.
  • Program is subject to Terms and Conditions outlined on the application.
  • Visit with your electrical utility to discuss your conduit and charging needs and pick up an application form.
  • Submit payment request after purchase and installation.
Additional Information
Commercial Charger

EARN AN INCENTIVE

for the installation of an electric vehicle public charging station.

  • Direct Current Fast Chargers (DCFC) must be preapproved before equipment is ordered.
  • Charging stations must be available for public use 24/7.
  • DCFC: Limit of one per business location (50 kW minimum rated charging capacity).
  • Level 2 charging stations: Up to four per business location.
  • Incentive is not available for federally funded charging stations (NEVI, CFI, etc.)
For Non-Profit Organizations
  • 90% reimbursement for the installation of an EV charging station.
  • Grants, discounts, etc., are deducted to determine customer’s cost.
  • Incentive is based on the lower of two qualified bids.
For All Other Businesses
  • $200/kW of charging station capacity.
  • Incentive is capped at 50% of charging station cost.
Guidelines
  • Available to commercial customers of Nebraska Public Power District and its wholesale utility customers.
  • Only available to non-residential accounts.
  • Public charging station installation must be at a commercial/workplace site.
  • To obtain the incentive, all steps on the application must be completed and submitted to utility along with the two bid proposals and verification of installation.
  • This incentive is for the installation of equipment for minimum ampacity of the following charger loads per the National Electrical Code (NEC) and/or the running of appropriately sized conduit per NEC from the load center to a future EV charging station.Load Requirements (exact requirements may vary):
    — Level 2: single phase, 240 volts, 32 amps per port.
    — Level 3 (DCFC): 480V AC, 3-phase, 80A, 60 Hz.
  • Program is subject to Terms and Conditions outlined on the application.
  • Visit with your electrical utility to discuss your charging needs and pick up an application form which includes the approval section.
  • Submit final payment request after purchase and installation.
Additional Information
Skip to content