Commercial Incentives
Commercial Conduit
EARN A $1,000 INCENTIVE
for new commercial construction conduit for a future public charging station
100% reimbursement (maximum of $1,000) for new commercial construction for the installation of conduit to be used for the future installation of an electric vehicle public charging station.
Guidelines
- Available to commercial customers of Nebraska Public Power District and its wholesale utility partners.
- Commercial conduit installation must take place at a new construction or commercial/workplace site.
- To obtain the incentive, all steps on the application must be completed and submitted to utility along with cost details and verification of installation.
- This incentive is for the installation of conduit for use with conductor for minimum ampacity of the following charger loads per the National Electrical Code (NEC) and/or the running of appropriately sized conduit per NEC from the load center to a future EV public charging station. Load Requirements (exact requirements may vary):
— Level 2: Single phase, 240 volts, 32 amps per port.
— Level 3 (DCFC): 480V AC, 3-phase, 80A, 60 Hz. - Program is subject to Terms and Conditions outlined on the application.
- Visit with your electrical utility to discuss your conduit and charging needs and pick up an application form.
- Submit payment request after purchase and installation.
Additional Information
Commercial Charger
EARN AN INCENTIVE
for the installation of an electric vehicle public charging station.
- Direct Current Fast Chargers (DCFC) must be preapproved before equipment is ordered.
- Charging stations must be available for public use 24/7.
- DCFC: Limit of one per business location (50 kW minimum rated charging capacity).
- Level 2 charging stations: Up to four per business location.
- Incentive is not available for federally funded charging stations (NEVI, CFI, etc.)
For Non-Profit Organizations
- 90% reimbursement for the installation of an EV charging station.
- Grants, discounts, etc., are deducted to determine customer’s cost.
- Incentive is based on the lower of two qualified bids.
For All Other Businesses
- $200/kW of charging station capacity.
- Incentive is capped at 50% of charging station cost.
Guidelines
- Available to commercial customers of Nebraska Public Power District and its wholesale utility customers.
- Only available to non-residential accounts.
- Public charging station installation must be at a commercial/workplace site.
- To obtain the incentive, all steps on the application must be completed and submitted to utility along with the two bid proposals and verification of installation.
- This incentive is for the installation of equipment for minimum ampacity of the following charger loads per the National Electrical Code (NEC) and/or the running of appropriately sized conduit per NEC from the load center to a future EV charging station.Load Requirements (exact requirements may vary):
— Level 2: single phase, 240 volts, 32 amps per port.
— Level 3 (DCFC): 480V AC, 3-phase, 80A, 60 Hz. - Program is subject to Terms and Conditions outlined on the application.
- Visit with your electrical utility to discuss your charging needs and pick up an application form which includes the approval section.
- Submit final payment request after purchase and installation.